Physical Design
Converting RTL into High-Performance, Manufacturable Silicon
Our Physical Design services transform validated RTL and synthesized netlists into optimized physical layouts ready for tape-out. We deliver end-to-end backend implementation, focused squarely on achieving performance, power, area, and timing objectives while safeguarding physical manufacturability.
Our engineers operate across the full implementation flow - from synthesis and floorplanning through placement, clock tree synthesis, routing, and sign-off closure - to deliver a tape-out-ready design with confidence.
Physical design services
Our Capabilities
Backend implementation engineered for tape-out confidence.
Physical implementation
Floorplan and route view
Macro placement
Power grid
IR drop within target
Placement
98.4% utilization
Timing closure
Positive slack
layout
Logic synthesis
Congestion analysis and resolution
Physical synthesis and optimization
Static Timing Analysis (STA)
Floorplanning
Timing closure
Macro placement and optimization
Signal integrity analysis
Power planning
Power optimization
Power grid implementation
IR drop analysis
Placement optimization
Electromigration analysis
Clock Tree Synthesis (CTS)
ECO implementation
Routing
Physical implementation sign-off support
A measured path from netlist to manufacturable layout.
Every implementation decision is shaped by the interaction between timing, power, area, signal integrity, and physical reliability.
PPA-driven implementation
We balance performance, power, and area from synthesis through sign-off, keeping implementation decisions tied to measurable silicon objectives.
Closure through the full flow
Floorplanning, placement, CTS, routing, and analysis are managed as one connected flow so issues are found early and resolved with context.
Manufacturability at tape-out
Physical checks, reliability analysis, ECOs, and sign-off support build confidence in a clean, manufacturable layout database.
Optimized synthesized netlist
Power and performance analysis
Floorplan and physical implementation database
ECO implementation results
Timing and physical closure reports
Tape-out-ready layout database
